Reconstruction Of NAC

2010-09-133.jpg2010-12-13 lounge.jpg2010-04-08 reconstruction halfway through1.jpg2009-10-22 the beginning of of the demolition.jpg2009-10-22 the beginnig of the demolition.jpg2010-09-13 2.jpg2010-06-30  interior finishing3.jpg2009-10-22 the beginning of the demolition4.jpg2010-12-13 galerija-konferencijos-erdve-gallery-conference-room.jpg2010-06-30 facade is almost coplete2.jpg2010-04-08 reconstruction halfway through3.jpg2011-01-11 finished.jpg2010-09-27 2.jpg2009-12-04 in the begining reconstrucion1.jpg2009-10-22 the beginning of the demolition.jpg2010-04-08 reconstruction halfway through2.jpg2011-01-11 rezidencija-residence.jpg2010-06-30  interior finishing2.jpg2010-06-30  interior finishing1.jpg2010-09-27 3.jpg2010-06-30 facade is almost coplete1.jpg2011-01-11 residence-studio-ground-floor-view-to-ceiling.jpg2010-09-27 1.jpg2011-01-11 rezidencija-gyvenamasis-residence-living-room2.jpg2010-09-13 1.jpg2010-12-13 ramp.jpg2010-04-08 reconstruction halfway through4.jpg2010-12-13 koridorius-corridor.jpg2009-12-04 in the begining reconstrucion3.jpg2010-04-08 reconstruction halfway through5.jpg2009-12-04 in the begining reconstrucion2.jpg2011-01-11 valgomasis-seminarai-eating-room-seminars1.jpg2010-12-13 luxury room almost complete.jpg

gallery